My helper, adding water to the concrete mix for the 2nd half of the concrete mold for the bulb.
The mold is cast, now I'm keeping it damp for a few days to let the concrete strengthen. Then waiting for a couple weeks for all the moisture to go away. I plan to do a single pour, using hi-temp silicone to seal the two halves of the mold. R/C guys do this, I hear.
Like Christmas!
This is the last of the lead (mail carrier was relieved to know), a crap load of epoxy, a s.s. threaded rod for the keel, etc.
No comments:
Post a Comment