I have some low spots on the deck near the cockpit edge where I didn't do such a good job of aligning the deck/cockpit edge when I glued the deck down. Two layers of toothed-trowel bog should bring the low spots up.
I bought 3 gallons of "Raka" epoxy for the fairing and glass sheathing work. It's half the price of West; for fairing where most ends up on the floor who cares about the brand, and for sheathing it's lower viscosity (is that right? -anyway it's runnier) and slow cure time should make things go easier for this one person shop.
Tuning up the quiver. Most of these were made for a keel fairing project, and are too flexible for the i550's straight-ish lines. I added a stiffener to two of them and I'll see how that goes.
Holy chicken feet!
Internal plug for the base of the mast is now done and ready to set aside until ready to start mast work.
Huh? What are these?
Not ballast!
No comments:
Post a Comment